DP vs PG is a distinction between structural design pressure and a broader window performance grade. A DP value alone does not establish the air, water and other applicable performance requirements represented by a NAFS PG rating. Before ordering, match the complete designation and supporting evidence to the actual window.
For U.S. buyers comparing window quotations, the useful question is not simply which number is higher. It is whether the proposed product meets the project’s documented requirements at the ordered size, opening arrangement and installation conditions. Start with our window selection and procurement hub if you are still planning the overall package.
Use the seven checks below to turn a short sales description into a traceable purchase decision. Keep the designer’s requirements, supplier’s evidence and final order in the same file so missing information is visible before a deposit.
1. What is the difference between DP vs PG ratings?
Design pressure, or DP, describes structural load performance and is commonly stated in pounds per square foot, abbreviated psf. Performance grade, or PG, requires completion of the applicable NAFS tests, including structural, air leakage and water penetration requirements. See the FGIA explanation of performance grade. Treat a bare DP entry as incomplete evidence of the broader performance package.
| Entry on a quotation | What it helps you review | What to request |
|---|---|---|
| DP value | The stated structural pressure capacity and its basis | Positive and negative values, units, supporting record and product scope |
| PG designation | A broader set of applicable performance requirements | Full class, grade, product identification, size scope and certification evidence where claimed |
| A brochure’s highest rating | A starting point for a supplier question | Written confirmation of the rating applicable to each proposed order line |
Neither abbreviation identifies your window by itself. Put the manufacturer, series and drawing reference beside the value. If two quotes describe different opening styles or sizes, resolve those differences before using the ratings to rank the offers.
A concise supplier question is: “Please identify the complete performance designation for this quoted configuration and provide the record that supports it.” That request is more useful than asking whether the whole brand has a good DP rating.

2. Who sets the required window design pressure?
Your project team needs to establish the required loads and acceptance criteria. Pella’s 2026 Architectural Design Manual, page 48, explains that wind design pressure depends on factors including wind speed, building height, exposure, topography and location on the building. Its guidance distinguishes positive pressure from negative pressure, including higher suction demands in corner zones.
Ask for a window schedule with an opening reference, location, required positive and negative design pressures, units and load basis. Have the designer confirm that the supplier’s values use a compatible basis. Do not compare an ultimate-load number with an allowable-design value as though the labels were interchangeable.
For a multi-storey project, keep floor and elevation references in the schedule. If two similar-looking windows have different requirements, ask the designer to confirm the intended allocation. Do not average the values or move the stronger unit to another opening without reviewing the schedule.
DP vs PG is not a conversion from a hurricane category to a shopping specification. Ask the responsible designer to establish the requirements at the actual site; do not select a universal psf value from a storm headline or an online comment.
- Obtain the project location and the applicable design brief.
- Keep each opening tied to its required pressures and performance class.
- Ask who reviews proposed products and substitutions.
- Resolve unclear units and load bases before comparing quotations.
3. Are you reading the complete performance designation?
FGIA describes product type, performance class, performance grade and tested size as parts of the performance specification. Its guidance also places product selection with the architect or structural engineer. A class abbreviation should not be selected solely because the building is called residential or commercial.
NAFS means the North American Fenestration Standard. The FGIA NAFS overview lists different standard editions and operator types. Record the edition actually required by the project and the edition stated in the supplier’s evidence. A reference to NAFS without an edition leaves an important review question unanswered.
Ask the supplier to show the designation in its original context, rather than retyping a few characters into an email. Keep the source page and its product identification together. If a certification is claimed, request the relevant listing and the applicable labeling information; a laboratory report and a certification claim are not automatically the same thing.
For comparison, give each supplier the same schedule and request a response against every opening. Mark a missing class, unsupported size or unresolved edition as an open item. Do not fill an empty field using a similar-looking product elsewhere on the website.
Remember to check: the separate window air leakage buying checklist explains how to compare leakage values and their test conditions. A PG designation does not make every product’s detailed leakage result identical.

Preparing a window enquiry? Share the opening schedule and performance brief so the product discussion starts with the same sizes and requirements.
4. Does the evidence cover your size and joined assembly?
A large opening may contain several individual units connected by mullions. Ask for evidence covering both the units and the joining arrangement. Andersen’s design pressure FAQs distinguish tested and certified joining systems from calculated mullion capacities within its own product ranges. That distinction is a useful buying question; its product-specific arrangements should not be generalized to every manufacturer.
For a picture window with operable side panels, identify the width and height of each component, the overall opening and the proposed connectors. Ask whether the quoted configuration is covered by the supplied records and which installation details apply. Keep any engineering review with the corresponding drawing revision.
Use the same discipline for casement windows and sliding windows. The fact that two products have aluminum frames does not identify the tested assembly or the permitted size range. Ask the supplier to map its evidence to the actual ordered units rather than attaching a report for an unspecified sample.
For an oversized opening, request two clearly defined options if necessary: a different division of units or another documented system. Compare how the change affects sightlines, ventilation, operating access and the performance review. Do not assume a visually simpler arrangement has the same supporting evidence.
Keep mullion responsibilities explicit. Ask who supplies the connectors, who checks the joining design and who installs the assembly. A supply-only quote should identify the documents the site contractor needs before the units arrive.

5. Are design, structural test and water test pressures being confused?
These pressures can appear together in a performance table, but they answer different questions. Andersen’s 400 Series performance guide, page 1, gives an example of PG50 associated with 50 psf design pressure, a 75 psf structural test pressure and a 7.5 psf water test pressure. The guide says to use the design-pressure basis, rather than the higher structural test pressure, when reviewing design-pressure compliance.
This is a published manufacturer’s example, not a George product rating or a universal recommendation. Use it to recognize the separate columns. Do not copy its values into your own window schedule or treat its standard editions as the required editions for every current project.
A higher structural proof-test number is not permission to increase the project’s allowable design pressure. Likewise, the pressure used during a water penetration test should not be relabeled as a structural DP. Read the report headings, method, specimen and acceptance criteria together.
If a supplier offers a summary sheet with one unlabeled “pressure” column, ask for a revised sheet. Give structural design, structural test and water performance separate fields. This prevents an attractive number from being compared with a different kind of measurement in the next quotation.
Request the actual water performance record needed by the specification, not an informal promise that the window is waterproof. Ask the project team to confirm the relevant laboratory or field requirements and how completion will be documented.

6. Does PG settle impact resistance, local approval and installation?
Keep these questions separate in the purchase brief. A pressure designation alone is not evidence that the exact product satisfies a particular impact requirement or local approval route. Identify the required supporting documents with the designer or approving authority before the order is released.
Remember to check: for a Florida project, use our Florida Product Approval and Miami-Dade NOA checklist for the separate approval-record review. Confirm the exact configuration and limitations rather than treating a pressure value as the entire approval.
Also retain the energy requirements. Use the NFRC and ENERGY STAR window guide to organize that part of the enquiry. Heat-transfer performance and the pressure designation belong in different fields, even when they are reviewed for the same order.
Agree on the installation scope while suppliers can still quote the same work. Request the applicable installation instructions and wall-interface details, identify anchors and substrates for review, and assign responsibility for flashing, drainage and perimeter joints. Record who checks the proposed detail and handles deviations.
At handover, keep the agreed inspection and any specified field-testing records with the product file. A visual condition check is useful, but it does not reproduce a laboratory performance test. Do not accept a verbal assurance as a replacement for a required completion record.
7. What should your window order evidence file contain?
Build a short evidence register around the opening schedule. Each row should connect a requirement to a proposed product, a source document and a review decision. The buyer should be able to see which questions are resolved and which still need an answer.
| File item | Information to keep |
|---|---|
| Project brief | Address, applicable requirements, load basis and reviewing party |
| Opening schedule | Opening reference, dimensions, operator type, required class and signed pressures |
| Product evidence | Series, full designation, standard edition, tested or covered size and supporting reference |
| Assembly details | Glass, hardware, mullions, joining arrangement and applicable installation documents |
| Separate checks | Energy, impact and local approval evidence where required |
| Order release | Approved revision, unresolved exclusions, substitution process and handover documents |
Before paying a deposit, ask each supplier to confirm what is included: glazing, hardware, screens, joining parts, packaging, transport arrangements and site work. If a price changes after the performance review, ask which specification or scope changed. Keep the comparison on the same basis.
For an international supply enquiry, send the requirements before requesting a final quotation. A general description such as “strong coastal aluminum windows” is too broad to resolve document scope. List the actual project requirements and have the responsible project team review the proposed package.
After approval, require substitutions to return through the same review process. A different glass build-up, operating arrangement or joining detail should be recorded rather than hidden in a later order revision. Keep the final documents available for the installer and the handover file.

Send George your project location, opening schedule, preferred window styles, required performance brief and the documents already available. Highlight the gaps so the next discussion can focus on a comparable quotation and the records needed before ordering.
FAQs about window DP vs PG ratings
What is the main difference between DP and PG for windows?
DP concerns structural design pressure. PG represents a broader set of applicable NAFS performance requirements. Request the complete designation and evidence for the actual product instead of treating a DP value alone as proof of the full performance package.
Does PG50 mean a window is suitable for every coastal home?
No. Suitability depends on the project requirements, product configuration, size scope and applicable installation and approval conditions. Have the responsible project team review the proposed product against the requirements for each opening.
Can I use structural test pressure as the window design pressure?
No. Keep the design-pressure value separate from the higher structural proof-test pressure. Use the appropriate design-pressure basis and supporting product scope for the project review.
Do two PG rated windows automatically make a rated joined assembly?
Do not assume so. Ask for evidence covering the joining system, overall dimensions, components and installation arrangement. Identify which parts are tested, certified or supported by engineering and have the proposed assembly reviewed.
Does a DP or PG number prove impact resistance?
A pressure number alone does not establish impact compliance for a particular project. Obtain the required impact and approval evidence for the exact product and configuration, separately from the pressure review.
What should I send a window supplier to obtain a comparable quote?
Send the project location, opening schedule, dimensions, opening styles, required performance class and pressures with their basis, approval and energy requirements, and installation scope. Ask the supplier to map its proposed products and evidence to each schedule line.
Explore window options for your project
Discuss these opening styles alongside the required performance and document scope. A product category or image does not establish a particular DP or PG rating.