For a hotel or apartment project, specify wind pressure and debris impact requirements for each opening, then ask for documents that cover the proposed window and its installation. “Hurricane window” is a marketing term. The same window assembly may have evidence for wind pressure, debris impact and other requirements, but each claim needs to be checked separately.
A hotel guestroom, a corner apartment and a ground-floor lobby can look similar on an elevation while needing different window configurations. Give bidders one opening schedule and ask them to identify where their proposal departs from it. Resolve those differences before comparing prices or approving production.

Separate Wind Pressure from Debris Impact
Wind pressure requirements address loads on the window and its connection to the building. Impact requirements address exposure to flying debris under the applicable criteria. An impact test can also include pressure cycling. ASTM describes the relationship between its debris-impact specification and its test method in the E1996 scope and the E1886 method description. Ask the project team which standard, edition and approval route apply at the site.
Request evidence for the complete proposed assembly. A glass description or a report for a different size, frame, opening type or fixing arrangement cannot establish that the quoted unit is covered. Specify separate water, energy and acoustic requirements wherever those matter to the project.
Build an Opening Schedule Bidders Can Price
| Schedule field | What to include |
|---|---|
| Location and quantity | Building, elevation, floor, room type, opening mark and quantity. Identify corner units and unusually exposed locations. |
| Size and operation | Rough opening and proposed frame dimensions, fixed or operable configuration, opening direction and required hardware. |
| Performance | Project-specified positive and negative pressures, debris protection where required, water resistance, energy and acoustics. |
| Wall interface | Substrate, fixing details, sill drainage, flashing and responsibilities for the surrounding wall work. |
| Evidence and exceptions | Manufacturer, model, document reference, covered configuration and deviations that require review. |
For repeat units, group openings after the designer confirms they share the same requirements. If a bidder proposes a smaller frame, different glazing or alternative hardware, record the change against the affected opening marks.

Review the Model and Installation Documents
For a Florida project, look up the relevant records in the Florida Product Approval database or the Miami-Dade Product Control database, as applicable. Check the exact model, dimensions, glazing, permitted use and installation conditions. Ask the project team to confirm whether the record covers the proposed installation. For a step-by-step document comparison, see George’s Florida approval and NOA guide.
For an Australian project, ask the responsible designer to identify the applicable National Construction Code provisions and evidence required for the building and site. Treat approvals from another jurisdiction as supporting material for review. Confirm local acceptance before treating them as the basis for an order.

Compare Hotel and Apartment Operating Needs
Hotels: Start with representative guestroom types and rooms facing traffic or exposed elevations. Set the required acoustic performance and ask for evidence for the proposed assembly. Review hardware operation, cleaning access, spare parts and room-by-room replacement logistics with the operator.
Apartments: Check how the façade will be accessed for maintenance and replacement. Confirm operating restrictions, cleaning access and any project requirements for guards, escape openings or screens with the design team. Decide who will manage any separate protective system where the project permits one.
For either building type, compare the same supply and installation scope. Include fixings, perimeter work, packing, freight, local handling and warranty responsibilities. Obtain insurance terms from the insurer for the actual building and policy before including any premium change in the budget. Use the US and China window quotation guide to align the cost categories.

Send George a Window Package for Quotation
Share the project city, building type, opening schedule and elevations. Include the performance requirements supplied by the design team, preferred finishes, required documents, delivery target and the installation scope you want priced. Mark pending decisions so the proposal can identify assumptions and exclusions.
Browse the George window range for opening and material options.
Frequently Asked Questions
Are all hurricane windows impact resistant?
The label alone does not establish impact resistance. Ask for the proposed model and supporting evidence, then verify that the assembly and installation fall within its scope.
Can an impact-rated window replace shutters?
That depends on the approved protection strategy for the opening and the local requirements. Have the project team confirm whether the proposed window provides the required protection on its own.
Does impact testing show how quiet or watertight a window is?
Request separate evidence for the proposed assembly’s acoustic and water performance. Confirm the relevant conditions and rating with the design team before using either in a specification.
Can one approval cover every size on a hotel elevation?
Review the record’s size, configuration and installation limits against each opening. A larger unit or a different frame connection may require a different configuration or additional review.